The Theemswegtracé is the solution for the problem at the Caland bridge near Rozenburg. This steel lift bridge for train, road and other traffic, in the Rotterdam port area, is the connection in the Betuweroute to the European hinterland.
For this project we worked together with our partner VolkerRail and supplied about 25,000 tons of washed Bestone trackballast. The volume has been delivered Just In Time by 1,700 ton barges.